Re-ordering

Pictures detailing the reordering and refurbishment of the church.
As with many buildings age takes its toll and we need to make good use of the space. The pictures largely taken by Drew, detail the progress amongst other things reparing the roof, replacing the heating, electrics, floor, and heating systems.

There are 31 photos for this gallery.
Page : 1  | 2
Pews_out Font in Heating chanels
Pumped subfloor Hope is delivered Concrete pump
subfloor non permiable membrane NPM and duicting
Surface prep prep surface cable ducts
prep floor 24th June removing pewes
South Isle plaster space
repair memorial protection oldfloor
Page : 1  | 2